ADU Framing
Elias brings a wealth of expertise and holds a license in framing, his expertise is ADUs, home additions, and new constructions.
SERVING SAN FERNANDO VALLEY & PASADENA
Elias
Licensed Contractor
With a robust career spanning back to 1990, Elias has specialized in framing buildings, residences, and apartments. His extensive 30-year framing tenure ensures your project benefits from seasoned expertise. You can trust that any endeavor he undertakes will meet rigorous standards, guaranteeing successful rough inspections.
Services & Cost
Framing fees for a 20X20 garage conversion to ADU start at $17,000 for labor plus materials.
-
Labor included: All rough framing, installation of only the garage door footing, holdowns with epoxy, interior shear walls, installation of the front door and windows.
-
Homeowner to pay for the Epoxy Deputy inspection fee of $300 - $350
-
Homeowner to buy all the lumber and accessories for a complete framing installation, including doors and windows.
-
The estimated cost for the materials is $4,000 - $5,000
-
All work to pass inspection
Bundle & Save
Elias can build 60% of a 20x20 ADU starting at $44,000. This service includes:
-
Installation of one footing under the garage door, including anchor bolts with epoxy
-
All rough framing per plan and Redgard
Installation of 3 windows and the front door (windows and door provided by the owner)
-
Installation of insulation
-
Installation of interior shear walls
-
Exterior stucco to cover the garage door and stucco around the new windows and front door
-
Installation of drywall ready to be primed and painted.
-
Installation of a 9,000 BTU Minisplit with a 6-year warranty
Two story ADU
Elias was the framer for this project. Along with Framing Elias provided stucco and drywall services.
Footing and Framing
-
Footings and Framing go hand and hand. The best way to frame the ADU is for the same contractor to install the footing and rough framing at the same time.
-
Save time and ask the framer to provide an estimate for the installation of Insulation.
FOOTINGS
The plans will call for a 12" or 24" Footing for a garage conversion to ADU. If you want to find out if the garage has footings watch this video. If the garage does not have a footing this is the process to take in order to pass the rough inspection
ROUGH FRAMING
Below are the steps required to pass the rough framing inspection. An experienced ADU framer will know what to do.
Process
1
FOOTINGS
3
HOLDOWNS &
EPOXY
INSPECTION
2
ROUGH FRAMING
4
INSTALLATION OF THE SHEAR WALLS
Items required to pass Framing inspection
-
Footings, if not available
-
Rough framing, including rough framing around new windows and front door door
-
Anchor bolts & hold-downs. Must pass a special epoxy inspection.
-
Installation of new construction windows and front door
-
Roof airflow vents
-
Range hood metal duct vent
-
Shear walls
-
Resilient Channel ( if you have an attached garage )
-
Installation of Redgard
How it works for an ADU Rough Framing estimate
-
1: Book an appointment
-
2: Initial conversation with Elias
-
3: Email approved ADU plans
-
4: Rough estimate via email
-
5: Final estimate at site walkthrough
Local Contractor
Elias is a local Framer in San Fernando Vally Burbank, Pasadena and Palmdale
LICENSED
-
The base labor cost to frame a 20x20 ADU begins at $17,000. Please note that the estimate does not cover lumber expenses.
BEFORE YOU BOOK
-
Elias will only take appointments in San Fernando Valley, Pasadena, and Glendale. Appointments booked outside of his local area will be canceled
Hello :)
Elias is not taking appointments at this moment please book an appointment with Fernando